Opening of productive layers and well development
Seller: al_ac
Price: 3.65 USD
Available. The final price depends on the selected options and is checked before payment.
Product description
Determination of the radius of penetration of drilling mud filtrate
The task
- Determine the radius of penetration of the drilling mud filtrate into the productive formation according to your version (select the version number by the ordinal number in the credit list):
a) changing the borehole diameter - 151 mm; 165.1 mm; 190.5 mm; 215.9 mm;
b) changing the coefficient of open porosity - 5%; ten %; 15 %; 20 %;
c) changing the drilling time of the productive formation - 5 hours; 10 hours; 15 hours; 20 hours
- Based on the data obtained, build graphs of the dependence of the radius of penetration of the drilling mud filtrate on: the diameter of the well; open porosity coefficient; time of impact on the reservoir and draw appropriate conclusions.
Additional information
Tyumen industrial University